Safely Transported The Shipment for Transformer and Accessories for The 3rd Wind Power Project, Soc Trang, Vietnam
 

- Project: The 3rd Wind Power Project, Soc Trang, Vietnam

- Commodity: transformer and accessories

- Volume:

+ Shipment 1: 01 cont 20’

+ Shipment 2: 01 cont 20’

+ Shipment 3: BB cargo 107 packages, total weight 111.06 tons

+ Shipment 4: transformer and accessories, include 69 packages, total weight 112 tons, of which, the dimension of transformer is 6.2mL x 2.42mW x 3.3mH x 45 tons.

+ Shipment 5: 1 cont 40’ & 1 cont 20’

+ Shipment 6: 67 packages, total weight 184.7 tons

- POL: Shanghai, China

- POD: Ho Chi Minh port

- Vantage’s scope: customs clearance, port charge, trucking from port to job site and unloading at Soc Trang province.

- Shipment time: August to October 2020

For this shipment, Vantage guarantees absolute safety on-site handling and unloading, especially for special cargo such as transformer, we used hydraulic trailer 8 axles for transportation. Moreover, because the road to the job site is quite narrow, our engineers have to survey many times to come up with the most optimal plan, helping the goods pass through tight and narrow curves in the safest way.

(Road survey to provide the most optimal transportation plan)