Vantage Logistics surveyed the sea freight plan for the shipment of the 4th of oversized equipment and accessories (BreakBulk) for the PALU-3 coal-fired steam power plant project.





Go Back
Vantage Logistics surveyed the sea freight plan for the shipment of the 4th of oversized equipment and accessories (BreakBulk) for the PALU-3 coal-fired steam power plant project.

Project information:
Shipment 4th data:
Shipment 4th data:
- Shipment data: Project: PALU-3 COAL-FIRED STEAM POWER PLANT
- Commodity: Part of Stacker Reclaimer
- Volume: 560 PKGS
- Gross Weight: 1,536,319 KGS/ 7,916 CBM
- Vessel capacity of 11,529 DWT
- POL: Masan, Korea
- POD: Pantoloan, Indonesia

- Vantage’s scope: Sea transportation by Break Bulk from Masan to the destination port in Pantoloan, Indonesia.